Sheffield’s roads are in much better condition than this time last year, a survey carried out by the National Highways and Transport (NHT) Network has revealed.

The NHT’s Public Satisfaction Survey, which has independently questioned over 420,000 members of the public across the country about the highways and transport services in their area, found there has been remarkable 10 per cent increase in satisfaction of the road surfaces in Sheffield since last year.

This is thanks to the Streets Ahead team who are working hard to improve the city’s highways.

The survey also shows more people are satisfied with the highways services carried out as part of the Streets Ahead project including:

  •  An almost 10 per cent increase in satisfaction about the quality of repair to highways.
  •  Around a five per cent increase in satisfaction in the speed that repairs are carried out.
  • A four per cent increase in satisfaction in how damage to the highways and potholes are dealt with.

The NHT findings have been backed by a survey undertaken by Streets Ahead too.

The Streets Ahead team conducted a survey with residents who live in areas where highways work has already been completed.
Results show that there has been an impressive 33 per cent increase in the number of residents who are very satisfied with the condition of Sheffield’s roads in comparison to when they first asked residents what they thought.

The Streets Ahead survey also saw an increase in satisfaction in the condition of pavements (20 per cent), street lighting (35 per cent), maintenance of highway verges, trees and shrubs (five per cent), and the cleanliness of the roads and pavements (11 per cent).

Cllr Jack Scott, Sheffield City Council’s Cabinet Member for Environment, Recycling and Streetscene said: “The findings from both the National Highways and Transport Network’s survey and the Streets Ahead survey are really positive for Sheffield. They show us that the work we are doing is successfully turning Sheffield’s roads from some of the worst in the country to the best. This is a huge project but it’s great to see that we’re achieving what we set out to – smoother roads, better lighting, an improved environment and higher levels of public satisfaction.

“To date the Streets Ahead team has resurfaced over 280 miles of road and repaired over 22,700 potholes and we’re still going.”
Streets Ahead Core Investment Period Director, Graeme Symonds, added: “The findings from the surveys are really useful to Streets Ahead as they enable us to see how we’re progressing and what the public think of the improvements that we’re making. This is important to us and the fact that both surveys are showing such a significant increase in satisfaction is great news.

“Improvements to the highways will continue for the next three years and by the end of this period, residents and visitors to the city should see a huge difference to the condition of road surfaces across Sheffield.

“We’ll continue to carry out surveys as work progresses to monitor residents’ opinions of the improvements being made to the city.”